{"id":11451,"date":"2025-06-19T16:29:05","date_gmt":"2025-06-19T20:29:05","guid":{"rendered":"https:\/\/alofokedeportes.com\/en\/sin-categoria\/madrid-madring-circuit-works-for-the-spanish-f1-gp-will-be-completed-in-2026\/"},"modified":"2025-06-19T16:29:05","modified_gmt":"2025-06-19T20:29:05","slug":"madrid-madring-circuit-works-for-the-spanish-f1-gp-will-be-completed-in-2026","status":"publish","type":"post","link":"https:\/\/alofokedeportes.com\/en\/nationals\/madrid-madring-circuit-works-for-the-spanish-f1-gp-will-be-completed-in-2026\/","title":{"rendered":"Madrid: &#8220;Madring&#8221; circuit works for the Spanish F1 GP will be completed in 2026"},"content":{"rendered":"<h2>The &#8216;Madring&#8217; of F1 in Madrid: Completion date of the works<\/h2>\n<p>Madrid will host the Spanish Formula One Grand Prix in 2026, and the works of the new semi-urban circuit, known as &#8216;Madring&#8217;, are progressing well. Luis Garc\u00eda Abad, General Director of the project, confirmed to Alofoke Deportes that the completion of the works is scheduled for May 30, 2026.<\/p>\n<p>Garc\u00eda Abad made these statements during a visit to the works, where a small group of representatives from the media specializing in Formula 1 could see the progress of the circuit.<\/p>\n<p>The new track, which will combine urban and non-urban sectors, is still subject to homologation by the FIA (International Automobile Federation). The circuit is expected to be approximately five and a half kilometers long, specifically 5,470 meters, and will have 22 turns.<\/p>\n<p>One of the highlights of the circuit will be turn number eleven, named &#8216;La Monumental&#8217;. This banked curve is expected to be the longest in the world championship, with 540 meters and a 24 percent inclination.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The &#8216;Madring&#8217; of F1 in Madrid: Completion date of the works Madrid will host the Spanish Formula One Grand Prix in 2026, and the works of the new semi-urban circuit, known as &#8216;Madring&#8217;, are progressing well. Luis Garc\u00eda Abad, General Director of the project, confirmed to Alofoke Deportes that the completion of the works is [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":11452,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[997],"tags":[4374,1147,4375,2507],"class_list":{"0":"post-11451","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-nationals","8":"tag-circuit","9":"tag-formula-one","10":"tag-ifema","11":"tag-madrid"},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/alofokedeportes.com\/en\/wp-json\/wp\/v2\/posts\/11451","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alofokedeportes.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/alofokedeportes.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/alofokedeportes.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/alofokedeportes.com\/en\/wp-json\/wp\/v2\/comments?post=11451"}],"version-history":[{"count":0,"href":"https:\/\/alofokedeportes.com\/en\/wp-json\/wp\/v2\/posts\/11451\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/alofokedeportes.com\/en\/wp-json\/wp\/v2\/media\/11452"}],"wp:attachment":[{"href":"https:\/\/alofokedeportes.com\/en\/wp-json\/wp\/v2\/media?parent=11451"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/alofokedeportes.com\/en\/wp-json\/wp\/v2\/categories?post=11451"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/alofokedeportes.com\/en\/wp-json\/wp\/v2\/tags?post=11451"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}